|
Yakovlev YAK 42D VIP |
CHF 5'306'949 US$ 6'000'000 |
Quadro generale
Sommario | Tipo: | Jet | Costruttore: | Yakovlev | Modello: | YAK 42D VIP | Anno di costruzione: | 1992 | Ubicazione/sede: | Russia, Kazan, UWKD | Tempo complessivo (TTAF): | 17605 h | Prezzo: | US$ 6'000'000 (~ CHF 5'306'949) | Tutti i dettagli |
Rivenditore |
Aircraft Tools Consulting Ltd. Presnensky Val st., 27 123557 Moscow Russia
Tel.: +7 (495) 769 4242 Cellulare: +7 (916) 650 4707 |
contattare il rivenditore |
|
|
|
Dettagli
Sommario | Tipo: | Jet | Costruttore: | Yakovlev | Modello: | YAK 42D VIP | Anno di costruzione: | 1992 | Ubicazione/sede: | Russia, Kazan, UWKD | Tempo complessivo (TTAF): | 17605 h | Prezzo: | US$ 6'000'000 (~ CHF 5'306'949) | Atterraggi: | 8678 |
Motore (i) | Numero di motori: | 3 | Costruttore/Modello: | Lotarev D-36 turbofan | Lotarev D-36 turbofan | Lotarev D-36 turbofan | Potenza: | 63.75 kN | 63.75 kN | 63.75 kN |
Desrizione/Dettagli dei Motori | Powerplant: 3 x Lotarev D-36 turbofan engines, 63.75 kN (14,330 lbf) thrust each.
Design and development.
The engine was developed for the Yak-42, An-72 and An-74 aircraft and was very advanced when it was first introduced in the 1970s. The engine was designed by Vladimir Lotarev. The first test runs began in 1971, first flight tests followed in 1974, serial production began in 1977.
The engine has a single-stage fan with 29 titanium blades and a Kevlar outer shell, which is driven by a three-stage turbine. The six-stage low pressure compressor with titanium blades is driven by a single-stage non-cooled low pressure turbine. The seven-stage high-pressure compressor with steel blades is driven by a steel bladed high-pressure turbine.
Since the tradition in the Soviet era was to gradually and continuously improve engines in serviceability, engines went from Series 1 to 3A (depending on the application). The Series 1 (used on Yak-42D) did not feature any reverse thrust system however, series 1A to 3A were fitted with bucket-type thrust reversers (used on An-72/An-74). The most recent upgrade (after the Soviet breakup) is Series 4A which has been in manufacture since 2002. Improvements included updated curved titanium blades and a built-in reverse thrust device. More advanced blade design along with proprietary wear-resistant and heat-protective coatings have resulted in improved specific fuel consumption (kg/h/kgf) dropping from 0.65 to 0.63. Specified service life has also improved exponentially to 40,000 hours. |
Avionica | Details on request |
Attrezzatura | Details on request |
Esterno | Painting the aircraft as desired (2 options to choose from):
• Standard paint without varnish (2-3 weeks) - US $ 89 000 (+ to the cost of the aircraft)
• Painting with varnish coating (2-3 weeks) - US $ 113 000 (+ to the cost of the aircraft) |
Modifications/Conversions | Details on request |
Inspection Status | Details on request |
Foto
Contatto del venditore
|